Home EV charging, wired properly.

From a 15 amp point for the charger that came with the car, to a dedicated circuit for a wall charger.

  • A licensed electrician on every job
  • We call you back within 2 business hours
  • You get the price before any work starts
  • 350+ five star reviews on Google
  • On timeor your first hour is free
  • Price firstbefore any work starts
  • LicensedQLD contractor licence 92214

The options

  • A 15 amp power point for a portable charger
  • A dedicated circuit for a wall charger
  • Single phase or three phase, to suit the charger
  • Your own charger connected and commissioned
  • A check that the switchboard has room
  • A check that your supply can carry the extra load

How it goes

  1. Tell us about your setup

    The car, the charger, where the switchboard is and where you park.

  2. You get options

    Usually a simple one and a faster one, each with a price.

  3. We run the circuit

    Its own safety switch and breaker, cable sized for the charger.

  4. Tested and certified

    You get a certificate of testing and compliance when we finish.

Book a job

Tell us what you need and where. It takes two minutes.

  • We call you back within 2 business hours
  • You get the price before any work starts
  • Rather talk? Call 0420 488 693

Book a job

Tell us what you need. We reply within 2 business hours.

Rather talk? Call us on 0420 488 693.

The Goodfellows guarantee

Six promises we make on every job.

On time, or your first hour is free

We give you a time and we keep it. If we arrive late, the first hour of labour is on us.

Workmanship covered for life

If our workmanship ever fails, we come back and repair it free.

Two years on materials

Everything we supply carries a two year warranty.

A clean home when we leave

We clean up after ourselves and leave your place as tidy as we found it.

You always know what's happening

Who is coming, when, and what it will cost before any work starts.

Happy, or your labour refunded

If you're not satisfied with our labour, we put it right or refund it.

Common questions

Do I need three phase power?

Not always. It depends on the charger and how fast you want to charge. We'll tell you what your home can support.

I've got solar and a battery. Does that change things?

It can. We check the switchboard has room for the new circuit and that the supply can handle the load before we go ahead.

Ready when you are.

Call us Book online